5 and a 1/2 holes drilled in the ground
1 severed power line (yes I called julie, some yahoo didn't do his job).
1 cut half way through.
2 and a 1/2 days without a/c when its in the 90's.
1 pregnant woman and a 2 year old in the house without a/c.
3 visits from ComEd.
1 week setback and construction resumes.
26 bags of cement @ 60 pounds each.
6 holes @ 10 inches in diameter by 48 inches deep.
2 comments:
Wroblewskovich-Jones men are so awesome...
Love the bibs.
Post a Comment